Important notes: *The new HDPE and EX-DWV models have a special designed thicker edge (5mm) that sits on top of the desired pipes and require the pipes to be cut at 10mm bellow FFL of the concrete surface, helping to protect the pipes from heavy machinery.
*Plumbers removing soil incorrectly can cause the FFL to change on the day of pour.
*Bedding pipes at desired height with cement early in the pour will ensure BEST RESULTS. *** These notes are not on the downloadable files above or in the scribe file below***
Written downloadable fitting instructions
This picture shows how this screed move smoothly over the Screed Buddy System
These images show clearly how many rising pipes have been removed. As a builder you will see the SAFETY BENEFITS over and over as well as the TIME and COST SAVINGS $$$